7 yards of river rock gravel and 9 yards of Brazos cobble stone
9 cubic yards of rich topsoil
Bottom of the trench
Digging the trench
Dry creek bed from the top
Extended S cut into the right side of the trench
First load of topsoil and retaining wall extension.
Middle section of the trench
Retaining wall extension
River rock gravel and Brazos cobble stone
The topsoil has been spread
Trench dirt used for fill
Two loads of topsoil ready to be spread
Two pallets of mossy sandstone for creating tree border rings